Assembly sequence
Show whether the box is already formed and when the insert, product and accessories are loaded.
China factory · US contract packer · 3PL handoff
Approve the fitted insert and the packing operation together. Give the brand, contract packer or 3PL one controlled product configuration, loaded-sample record, assembly sequence and receiver-ready component plan.
Made to order in China for planned business production. US manufacture, local stock, customs treatment, warehousing and fulfillment services are not assumed.

1. Lock the loaded configuration
Product revisions can change fit. Tie the cavity map, sample and packing instruction to the SKU or product version actually reviewed.
| Configuration field | Record for the packout team | Why it matters |
|---|---|---|
| Product revision | SKU, L × W × H, weight, cap or accessory state | Prevents a new product version from inheriting an old fit approval |
| Insert map | Material, cavity position, orientation and finger access | Keeps retention and removal consistent at the packing line |
| Outer box | Usable internal size, closure and approved sample reference | Confirms the loaded insert does not prevent the box from closing |
| Visible identifiers | Barcode, lot label, orientation copy or required product face | Avoids hiding information the downstream process needs |
| Component set | Cards, tissue, sleeves, ribbons and units supplied per set | Supports counting, storage and exception handling |
2. Loaded sample and packout trial
A small operational trial can expose orientation, force, removal and component-handling questions before the bulk packaging reaches the packing location.

Show whether the box is already formed and when the insert, product and accessories are loaded.
Check that the product stays located during normal handling and can be removed without unintended damage.
Close the fully loaded box and review spacing, lid position and the first visible product face.
Capture the tested sequence, photos, exceptions, average component count and the version approved by the operating team.
3. Responsibility matrix
The correct owner depends on the project. Write the boundary instead of assuming the manufacturer, brand or 3PL will complete an unassigned task.
Quote this handoff| Work item | Owner to name in the brief |
|---|---|
| Product and SKU approval | Brand team or nominated product owner |
| Insert drawing and physical sample | Hansheng against the confirmed product and box information supplied |
| Packout trial | Brand, contract packer or 3PL team that will perform the work |
| Barcode and receiver labels | Buyer and receiver supply the current requirements; application owner is recorded |
| Destination and receiving scope | Buyer names the ship-to party and confirms its current intake rules |
From product data to US handoff
Each stage leaves a record for the next team.
Confirm SKU, product data, insert arrangement, outer box and packout owner.
Review the structure, loaded fit, removal, closure and visible identifiers.
Let the packing team test the sequence and record exceptions against the approved version.
Issue the component, carton and destination records without changing the packaging version.
Ready to plan the insert and US handoff? Open the US custom packaging enquiry form → and share the product, quantity, box, packer and destination ZIP code.
US fulfillment insert FAQs
Use the approved product and packaging version to test insert orientation, product retention, removal, box closure, assembly sequence, component counts, barcode or label visibility and units per master carton.
The brand should approve the product configuration and appearance; the manufacturer should document the insert and packaging version; and the contract packer or 3PL should validate the steps it will perform. Responsibilities depend on the project and should be written before release.
This page does not assume US manufacture, local stock, warehousing or fulfillment services. Hansheng is a China-based custom packaging manufacturer; the buyer should confirm its packer, receiver and delivery scope for each project.