Configuration ID
Link the product revision, box drawing, insert map, artwork files and sample reference.
Physical sample · Approval record · First production order
A signed sample is only useful when every team knows what it represents. Connect the physical evidence, drawing, artwork, product fit and approved exceptions to the exact packaging configuration released for production.
Made to order in China for planned business production. US manufacture, local stock, customs treatment, warehousing and fulfillment services are not assumed.

1. Define the sample scope
The approval record should match the physical condition reviewed. A blank structural sample, printed sample and fully loaded sample answer different questions.
| Evidence reviewed | Useful decision | Still open unless recorded |
|---|---|---|
| Structural sample | Assembly, opening, closure and basic dimensions | Final print, finish, product fit and downstream packout |
| Printed sample | Artwork placement, copy, colour reference and specified finish direction | Bulk colour tolerance, loaded fit and carton configuration |
| Loaded sample | Product orientation, retention, removal, insert contact and closed-box result | Production quantity, line method and destination handoff |
| Packer or 3PL trial | Assembly sequence, component count, labels and handling steps | Unassigned responsibilities and receiver-specific changes |
2. Sample decision log
A dated log prevents an accepted sample deviation from silently becoming the specification for every future order.

Link the product revision, box drawing, insert map, artwork files and sample reference.
Record fit, removal, closure, appearance and any functional check actually completed.
State accepted differences, required corrections and whether another sample is needed.
Name who approved the decision, the date and the exact evidence reviewed.
3. First PO release
The purchase order and technical release should point to the same controlled packaging version.
| Release field | What the buyer confirms | Why it protects the order |
|---|---|---|
| Quantity schedule | Units by SKU, size, artwork and destination | Prevents one total quantity from hiding different versions |
| Approved package | Drawing, insert, artwork, finish and physical sample reference | Ties the order to the evidence already reviewed |
| Component schedule | Box, insert, sleeve, card, tissue, bag or other parts per set | Gives the packer one countable bill of components |
| Packout owner | Who forms the box, loads the product, applies labels and closes the set | Stops an unassigned operation from appearing after delivery |
| Carton and destination basis | Units per carton, carton labels, ship-to ZIP codes and allocation | Connects production packing with the requested delivery scope |
| Open items | Unresolved decisions, owner and due date | Prevents an incomplete item from being treated as approved |
From sample to production order
Each decision leaves a record for the next team.
State the configuration, purpose and checks the sample is intended to answer.
Capture evidence, results, required changes and accepted exceptions against one version.
Let the packing and receiving teams confirm the steps and information they own.
Connect quantity, components, packaging revision, cartons, destinations and open items.
Request a sample-to-PO packaging quotation
We can review the packaging construction and what still needs to be controlled before a first production order. Share the destination ZIP code and who will pack the product so the quotation scope is explicit.
US sample-to-PO FAQs
Record the product and packaging configuration, drawing and artwork revisions, insert and closure checks, approved evidence, accepted exceptions, decision owner and date.
No. Sample approval confirms the recorded sample scope. A production release should separately confirm quantities, component versions, packout ownership, master-carton basis, destination allocation and unresolved items.
The brand should name the decision owner for product configuration and appearance. The manufacturer records the packaging version, while the contract packer or 3PL should validate the steps and receiving requirements it owns.
No. Hansheng is a China-based custom packaging manufacturer. US packout, warehousing, import entry and receiving responsibilities depend on the buyer's selected partners and should be confirmed for each project.